The most
important projects defined by the Director Plan and the Strategic
Plan of the Port of Vilagarcía to carry out in during the next years
are, in order of execution, the following:
Esplanade of service to the Commercial Quay,
that allows to obtain 24.270 square meters of surface and it has
a budget of 1,32 millions of euros. (Finished).
Ferrazo Quays, that allow to have a berth line
of 910 meters of length and a surface of 82.000 square meters,
with a budget of 23 millions of euros.
Ferrazo Quays, that allow to have a berth line
of 500 meters of length and a surface of 63.375 square meters,
with a budget of 13,22 millions of euros.
Enlargement of the West Commercial Quay, that
allows to obtain a berth line of 250 meters of length and a surface
of 12.352 square meters, with a budget of 3,61 millions of euros.
Complete railway link with an interior access
to every quay of the port.
Reorganization of the Port Uses
The new geometry of Vilagarcía Port brings
with it a complete and rational reorganization of the different
traffics, which will be distributed in the following way:
The liquid bulk Terminal is located in Ferrazo Quay, with 11 meters of depth and 250 meters of length, with a Ro-Ro ramp at the South side.
The Solid bulk Terminal is placed in the enlargement of the Commercial Quay, with the convenient depth in the West side and it uses the Ramal Quay with 250 meters of length for the traffic of cereals and any other bulk.
The multipurpose Terminal for general merchandise
is located in the new breakwater, with 13 meters of depth, 500
meters of berth line and 8,3 Ha. of surface suitable for all the
different traffics, containers included.
The frozen and perishable products Terminal is placed in Comboa Quay, with a length of 400 meters and links with the cold store industry.
The Passengers Teminal in the Ramal Quay, with 250 meters of length.