![]() |
||||
What will we do The chosen option by the Director Plan is going to allow a geometric modification of the port plan towards its interior, with different actions inside the sheltered waters of the present installations. With the execution of the new infrastructures along a first phase, the Port of Vilagarcía would obtain in a five-six year-period more suitable quays to receive separately the solid and liquid bulks as well as the general cargo. |
||||